Project Overview
Fitness Cartel Mackay is North Queensland’s largest fitness facility and Queensland’s second-biggest gym, a landmark project representing major investment in the Mackay region. Rewired Electrical was chosen to deliver the complete electrical fit out for this state-of-the-art health, fitness, and wellness destination.
The Facility
Fitness Cartel Mackay is a full-service health and wellness destination featuring:
- Wellness & Recovery Zone – Contrast pools, hot rock sauna, red light therapy, Normatec compression, and massage facilities
- Kids Cartel Crèche – Purpose-built playground with full-time carers for members’ children
- World-Class Training Zones – Spin cinema, reformer pilates studio, massive equipment floor, functional turf area
- Sports Courts – Pickleball court and half basketball court for members
The Challenge
Delivering a commercial electrical fitout of this scale in Mackay presented unique challenges for our Gold Coast-based team:
1. Scale & Complexity
This is the biggest Fitness Cartel facility we’ve worked on. The electrical scope covered multiple specialist zones, each with unique power, lighting, and data requirements:
- High-load equipment areas requiring robust power distribution and dedicated circuits
- Wellness zones with specialised lighting and climate control electrical systems
- Commercial kitchen and nutrition bar electrical infrastructure
- Childcare crèche with safety-compliant electrical installations
- Audio-visual systems for the spin cinema and training zones
- Emergency lighting, exit signs, and fire system integration across the entire facility
2. Working Away from Home
Our team flew to Mackay weekly or fortnightly throughout the project, working away from their families to meet deadlines. Coordinating a remote commercial fitout meant:
- Careful planning to maximise productivity during each site visit
- Coordination with other trades working simultaneously on-site
- Logistics management for tools, materials, and equipment between Gold Coast and Mackay
- Maintaining our quality standards while working under tight timeframes
3. Coordination with Client Vision
Fitness Cartel had a clear vision for a luxe, high-end facility that rivals dedicated day spas. Our electrical work needed to support that vision from mood lighting in wellness zones to reliable power for top-tier equipment across the training floor.
Our Solution: Electrical Work Delivered
Rewired Electrical delivered a complete commercial electrical fitout covering every zone of the facility:
Power Distribution & Switchboard
- Main switchboard installation and distribution boards throughout the facility
- High-capacity circuits for gym equipment, cardio machines, and strength training zones
- Dedicated circuits for contrast pools, saunas, and recovery equipment
- Kitchen and nutrition bar power infrastructure
- Backup power systems and surge protection for critical equipment
Lighting Systems
- LED lighting design and installation across all training zones
- Mood lighting for wellness and recovery areas
- High-output lighting for functional training zones and equipment floor
- Specialist lighting for spin cinema and pilates studio
- External façade and signage lighting
- Emergency lighting and exit sign installation throughout
Data & Communications
- Structured data cabling for network infrastructure
- Audio-visual cabling for spin cinema, TVs, and sound systems
- Security system electrical integration
- Access control and member check-in system electrical work
Specialist Zone Electrical
- Kids Cartel Crèche – Safety-compliant electrical work for childcare area
- Contrast Therapy Pools – Electrical connections for pool systems and heating
- Sauna & Red Light Therapy – Specialist electrical installations
- Basketball & Pickleball Courts – Sports lighting and power
Compliance & Safety
- All work completed to AS/NZS 3000 Australian Standards
- Queensland Electrical Safety Act 2002 compliance
- Certificates of Electrical Safety provided for all installations
- Final inspection and commissioning completed before facility opening
Project Highlights
Biggest Fitness Cartel Project to Date
This was the largest Fitness Cartel electrical fitout Rewired Electrical has delivered. The scale of the facility, the variety of specialist zones, and the complexity of electrical systems made this a standout commercial project for our team.
Team Commitment
Our team’s dedication to this project was exceptional. Flying back and forth between Gold Coast and Mackay weekly or fortnightly, working away from families, and maintaining our quality standards under pressure, the team absolutely nailed it.
Special recognition goes to every Rewired team member on this project. Your professionalism, skill, and commitment made this project a success.
Regional Impact
Fitness Cartel Mackay represents major investment in North Queensland and confidence in the regional economy. Being part of a project of this significance – one that will serve the Mackay community for years to come . It is something our team is genuinely proud of.
Results & Outcome
Fitness Cartel Mackay opened to the public in November 2025 as North Queensland’s largest fitness facility. The electrical infrastructure we delivered supports every aspect of the facility’s operations – from high-load gym equipment to luxury wellness zones and everything in between.
Project Success
- Complete commercial electrical fitout delivered on time
- All zones operational and compliant with Queensland electrical safety regulations
- Client satisfaction – Fitness Cartel now operates Queensland’s second-largest gym
- Team pride – Our biggest Fitness Cartel project delivered to our usual high standards